Make sure that the installed light metal frames with drywall or masonry wall is plumbed and squared to the floor. When installing on plastered masonry wall, it is highly recommended to provide a 6mm thick plywood backing preferably coated with anti-moisture compound (coal tar or gloss acrylic paint) on the surface in contact with the plastered wall.
Provide a 10mm gap at the top and Bottom of each panel and insert required s4s good lumber as panel edging. Cut the panel to required length with an angle grinder with cutting disk for wood or use a fine toothed finishing saw.
It is recommended to use an effective wood adhesive, fully covering the backside of the vertiflute panel using a roller brush or finely notched spreader that will be attached to the plywood or drywall backing.
For additional attachment, installer may use mechanical attachments such as finishing nails, or shoe tack.